Permit: TR-UTL-0124-00039
Permit Details
Apply Date:
01/05/2024
Applicant:
Tucson Electric Power
Description:
WO T93958 & T93852 - TEP TO REPLACE BAD POLE IN THE ROW, INSTALL 1 NEW POLE IN ROW & INSTALL 1 SECONDARY PEDESTAL. THE POLE HOLES WILL BE 6’ DEEP WITH A 20” DIAMETER. THE PEDESTAL 3’ X 3’ & 14” DEEP. TEP CONTACT IS CARLOS NUNEZ/(520) 390-6379
Permit Reviews
Permit Number - TR-UTL-0124-00039
Permit Status: Issued
Permit Description: WO T93958 & T93852 - TEP TO REPLACE BAD POLE IN THE ROW, INSTALL 1 NEW POLE IN ROW & INSTALL 1 SECONDARY PEDESTAL. THE POLE HOLES WILL BE 6’ DEEP WITH A 20” DIAMETER. THE PEDESTAL 3’ X 3’ & 14” DEEP. TEP CONTACT IS CARLOS NUNEZ/(520) 390-6379
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/08/2024 | RIGHT-OF-WAY REVIEW v.1 | 01/08/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0124-00039
Permit Status: Issued
Permit Description: WO T93958 & T93852 - TEP TO REPLACE BAD POLE IN THE ROW, INSTALL 1 NEW POLE IN ROW & INSTALL 1 SECONDARY PEDESTAL. THE POLE HOLES WILL BE 6’ DEEP WITH A 20” DIAMETER. THE PEDESTAL 3’ X 3’ & 14” DEEP. TEP CONTACT IS CARLOS NUNEZ/(520) 390-6379
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
01/08/2024 | Traffic Control set-up approved between 7AM - 5PM |
01/08/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Issued
Permit Number: TR-UTL-0124-00039
Permit Description: WO T93958 & T93852 - TEP TO REPLACE BAD POLE IN THE ROW, INSTALL 1 NEW POLE IN ROW & INSTALL 1 SECONDARY PEDESTAL. THE POLE HOLES WILL BE 6’ DEEP WITH A 20” DIAMETER. THE PEDESTAL 3’ X 3’ & 14” DEEP. TEP CONTACT IS CARLOS NUNEZ/(520) 390-6379
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/07/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
05/07/2024 | TRSP - ROW - Final/Close-Out | Passed |