Permit: TR-UTL-0124-00016
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3027 N WINSTEL BL
Address NEW:
3027 N WINSTEL BL
Apply Date:
01/03/2024
Applicant:
National Barricade LLC.
Description:
EXCAVATING A 51X3 TRENCH AT 3027 N WINSTEL BLV TO REPLACE GAS SERVICE IN ROW IN ASPHALT, CONCRETE AND DIRT. TRENCH WILL BE LOCATED APPROX 51' EAST OF EAST P/L AND 3' NORTH OF SOUTH P/L
Permit Reviews
Permit Number - TR-UTL-0124-00016
Permit Status: Complete
Permit Description: EXCAVATING A 51X3 TRENCH AT 3027 N WINSTEL BLV TO REPLACE GAS SERVICE IN ROW IN ASPHALT, CONCRETE AND DIRT. TRENCH WILL BE LOCATED APPROX 51' EAST OF EAST P/L AND 3' NORTH OF SOUTH P/L
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/03/2024 | RIGHT-OF-WAY REVIEW v.1 | 01/04/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0124-00016
Permit Status: Complete
Permit Description: EXCAVATING A 51X3 TRENCH AT 3027 N WINSTEL BLV TO REPLACE GAS SERVICE IN ROW IN ASPHALT, CONCRETE AND DIRT. TRENCH WILL BE LOCATED APPROX 51' EAST OF EAST P/L AND 3' NORTH OF SOUTH P/L
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 01/03/2024 | Traffic Control set-up approved between 7AM - 5PM |
| 01/03/2024 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual. |
| 01/03/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0124-00016
Permit Description: EXCAVATING A 51X3 TRENCH AT 3027 N WINSTEL BLV TO REPLACE GAS SERVICE IN ROW IN ASPHALT, CONCRETE AND DIRT. TRENCH WILL BE LOCATED APPROX 51' EAST OF EAST P/L AND 3' NORTH OF SOUTH P/L
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/09/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 02/07/2024 | TRSP - ROW - Final/Close-Out | Passed |