Permit: TR-UTL-0124-00014
Permit Details
Apply Date:
01/03/2024
Applicant:
Chelsey Bolinger
Description:
P.099175 KAHNA (PERMIT A) - BORE 218' & TRENCH 35' TO PLACE CTL CONDUIT & FIBER CABLE. OVERLASH 2,457' AERIAL CABLE. PLACE (1) CABINET & (1) HANDHOLE
Permit Reviews
Permit Number - TR-UTL-0124-00014
Permit Status: Complete
Permit Description: P.099175 KAHNA (PERMIT A) - BORE 218' & TRENCH 35' TO PLACE CTL CONDUIT & FIBER CABLE. OVERLASH 2,457' AERIAL CABLE. PLACE (1) CABINET & (1) HANDHOLE
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/03/2024 | RIGHT-OF-WAY REVIEW v.1 | 01/04/2024 | REQUIRES RESUBMIT |
01/09/2024 | RIGHT-OF-WAY REVIEW v.2 | 01/31/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0124-00014
Permit Status: Complete
Permit Description: P.099175 KAHNA (PERMIT A) - BORE 218' & TRENCH 35' TO PLACE CTL CONDUIT & FIBER CABLE. OVERLASH 2,457' AERIAL CABLE. PLACE (1) CABINET & (1) HANDHOLE
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
01/03/2024 | Traffic Control set-up approved between 7AM - 5PM |
01/03/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0124-00014
Permit Description: P.099175 KAHNA (PERMIT A) - BORE 218' & TRENCH 35' TO PLACE CTL CONDUIT & FIBER CABLE. OVERLASH 2,457' AERIAL CABLE. PLACE (1) CABINET & (1) HANDHOLE
Total Completed Inspections - 7
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/05/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
04/18/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
04/18/2024 | TRSP - ROW - AERIAL INSTALLATION | Passed | ||
04/18/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | ||
05/13/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
05/13/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
05/13/2024 | TRSP - ROW - Final/Close-Out | Passed |