Description:
*RE: Expired Permit T22RW01430** WO 6336655 & 6347008. TEP to trench & install 3,800' of conduit & cable, 11 above-grade cabinets & 15 sub-surface vaults. All pavement and concrete to be replaced as required.
Permit Reviews
Permit Number - TR-UTL-0123-00736
Permit Status: Complete
Permit Description: *RE: Expired Permit T22RW01430** WO 6336655 & 6347008. TEP to trench & install 3,800' of conduit & cable, 11 above-grade cabinets & 15 sub-surface vaults. All pavement and concrete to be replaced as required.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/01/2023 | RIGHT-OF-WAY REVIEW v.1 | 02/09/2023 | REQUIRES RESUBMIT |
| 02/16/2023 | RIGHT-OF-WAY REVIEW v.2 | 02/17/2023 | APPROVED |
Conditions
Permit Number - TR-UTL-0123-00736
Permit Status: Complete
Permit Description: *RE: Expired Permit T22RW01430** WO 6336655 & 6347008. TEP to trench & install 3,800' of conduit & cable, 11 above-grade cabinets & 15 sub-surface vaults. All pavement and concrete to be replaced as required.
| Date | Description | Comments |
|---|---|---|
| 02/16/2023 | Sun Tran | |
| 02/16/2023 | Traffic control set-up approved between 9AM - 3:30PM | |
| 02/16/2023 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0123-00736
Permit Description: *RE: Expired Permit T22RW01430** WO 6336655 & 6347008. TEP to trench & install 3,800' of conduit & cable, 11 above-grade cabinets & 15 sub-surface vaults. All pavement and concrete to be replaced as required.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/27/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 11/27/2023 | TRSP - ROW - SITE INSPECTION | Passed | ||
| 11/27/2023 | TRSP - ROW - Final/Close-Out | Passed | ||
| 11/27/2023 | TRSP - ROW - Recurring | Passed |