Permit: TR-UTL-0123-00593
Permit Details
Apply Date:
01/11/2023
Applicant:
Judy Boyer
Description:
2 5x5 bellholes in dirt/blktop on 5th St for crews to repair gas leak
Permit Reviews
Permit Number - TR-UTL-0123-00593
Permit Status: Complete
Permit Description: 2 5x5 bellholes in dirt/blktop on 5th St for crews to repair gas leak
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/16/2023 | RIGHT-OF-WAY REVIEW v.1 | 01/25/2023 | REQUIRES RESUBMIT |
| 01/26/2023 | RIGHT-OF-WAY REVIEW v.2 | 01/26/2023 | APPROVED |
Conditions
Permit Number - TR-UTL-0123-00593
Permit Status: Complete
Permit Description: 2 5x5 bellholes in dirt/blktop on 5th St for crews to repair gas leak
| Date | Description | Comments |
|---|---|---|
| 01/26/2023 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. | |
| 01/26/2023 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0123-00593
Permit Description: 2 5x5 bellholes in dirt/blktop on 5th St for crews to repair gas leak
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/02/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Met with Jeremy from Southwest Gas. Went over asphalt repairs, property owner notification, scope of work and length of work, only one day. No further issues. | |
| 01/17/2025 | TRSP - ROW - Final/Close-Out | Passed |