Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-0123-00555
Permit Details
Apply Date:
01/04/2023
Applicant:
Desert Barricades LLC
Description:
WO T22904 - TEP will be working in ROW to install new fiber in new bore to be installed by R-Directional Drilling for TEP. Bore and install 1-4" comm ducto 265' across 36th Street West of MLKing Jr Way. Bore will include bore pits and potholes to ID the existing utilities. TCP included.
Permit Reviews
Permit Number - TR-UTL-0123-00555
Permit Status: Complete
Permit Description: WO T22904 - TEP will be working in ROW to install new fiber in new bore to be installed by R-Directional Drilling for TEP. Bore and install 1-4" comm ducto 265' across 36th Street West of MLKing Jr Way. Bore will include bore pits and potholes to ID the existing utilities. TCP included.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/09/2023 | RIGHT-OF-WAY REVIEW v.1 | 02/02/2023 | REQUIRES RESUBMIT |
02/17/2023 | RIGHT-OF-WAY REVIEW v.2 | 02/17/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0123-00555
Permit Status: Complete
Permit Description: WO T22904 - TEP will be working in ROW to install new fiber in new bore to be installed by R-Directional Drilling for TEP. Bore and install 1-4" comm ducto 265' across 36th Street West of MLKing Jr Way. Bore will include bore pits and potholes to ID the existing utilities. TCP included.
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
01/23/2023 | Traffic control set-up approved between 9AM - 3:30PM |
Conditions
Permit Number - TR-UTL-0123-00555
Permit Status: Complete
Permit Description: WO T22904 - TEP will be working in ROW to install new fiber in new bore to be installed by R-Directional Drilling for TEP. Bore and install 1-4" comm ducto 265' across 36th Street West of MLKing Jr Way. Bore will include bore pits and potholes to ID the existing utilities. TCP included.
Date | Description | Comments |
---|---|---|
01/23/2023 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0123-00555
Permite Description: WO T22904 - TEP will be working in ROW to install new fiber in new bore to be installed by R-Directional Drilling for TEP. Bore and install 1-4" comm ducto 265' across 36th Street West of MLKing Jr Way. Bore will include bore pits and potholes to ID the existing utilities. TCP included.
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/20/2023 | TRSP - ROW - SITE INSPECTION | N/A | Complete (Recurring) |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0123-00555
Permit Description: WO T22904 - TEP will be working in ROW to install new fiber in new bore to be installed by R-Directional Drilling for TEP. Bore and install 1-4" comm ducto 265' across 36th Street West of MLKing Jr Way. Bore will include bore pits and potholes to ID the existing utilities. TCP included.
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/06/2023 | TRSP - ROW - Recurring | Passed |