Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
2619 N STONE AV
Address NEW:
2619 N STONE AV
Apply Date:
01/03/2023
Applicant:
Robert Reynolds - National Barricade
Description:
(1) 3'X6' bell hole in dirt front with an approx. 70'X2' trench in pavement along with an approx. 8' trench in dirt to install a new gas service. Crews will be working across N Stone Ave.

Permit Reviews

Permit Number - TR-UTL-0123-00550
Permit Status: Complete
Permit Description: (1) 3'X6' bell hole in dirt front with an approx. 70'X2' trench in pavement along with an approx. 8' trench in dirt to install a new gas service. Crews will be working across N Stone Ave.
Start Date Submittal Complete Date Status  
01/08/2023 RIGHT-OF-WAY REVIEW v.1 01/26/2023 APPROVED Review Details

Conditions

Permit Number - TR-UTL-0123-00550
Permit Status: Complete
Permit Description: (1) 3'X6' bell hole in dirt front with an approx. 70'X2' trench in pavement along with an approx. 8' trench in dirt to install a new gas service. Crews will be working across N Stone Ave.
Date Description Comments
03/30/2023 Sun Tran
03/30/2023 Traffic control set-up approved between 9AM - 3:30PM

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-UTL-0123-00550
Permite Description: (1) 3'X6' bell hole in dirt front with an approx. 70'X2' trench in pavement along with an approx. 8' trench in dirt to install a new gas service. Crews will be working across N Stone Ave.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
09/20/2023 TRSP - ROW - Final/Close-Out N/A Re-inspection required

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0123-00550
Permit Description: (1) 3'X6' bell hole in dirt front with an approx. 70'X2' trench in pavement along with an approx. 8' trench in dirt to install a new gas service. Crews will be working across N Stone Ave.
Total Completed Inspections - 1
Date Description Inspector Results Comments
07/06/2023 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed

Documents

File Name Document Type  
2619 N STONE AVE_V1.PDF DOCUMENTS VIEW
NPL CONSTRUCTION COMPANY 2619 N STONE AVE WR 4585642_V1.PDF DOCUMENTS VIEW
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW