Permit Details

Status:
Fees Due
Type:
Right-of-Way (ROW)
Address:
1702 S EUCLID AV
Address NEW:
1702 S EUCLID AV
Apply Date:
12/30/2025
Applicant:
Liam Smith
Description:
We will be performing one geotechnical boring within the City of Tucson Right of Way. The boring is located on the west side of S Euclid Ave between E Silverlake Rd and E 25th St in the shoulder. The boring will be approximately 30-40 feet deep and will be advanced with 6-8 inch outer diameter augers. We will backfill the borings with auger cuttings upon completion.

Permit Reviews

Permit Number - TR-ROW-1225-01578
Permit Status: Fees due
Permit Description: We will be performing one geotechnical boring within the City of Tucson Right of Way. The boring is located on the west side of S Euclid Ave between E Silverlake Rd and E 25th St in the shoulder. The boring will be approximately 30-40 feet deep and will be advanced with 6-8 inch outer diameter augers. We will backfill the borings with auger cuttings upon completion.
Start Date Submittal Complete Date Status  
12/31/2025 RIGHT-OF-WAY REVIEW v.1 01/09/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-1225-01578
Permit Status: Fees due
Permit Description: We will be performing one geotechnical boring within the City of Tucson Right of Way. The boring is located on the west side of S Euclid Ave between E Silverlake Rd and E 25th St in the shoulder. The boring will be approximately 30-40 feet deep and will be advanced with 6-8 inch outer diameter augers. We will backfill the borings with auger cuttings upon completion.
Total Outstanding Activity Conditions - 3
Date Name
12/31/2025 IS UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.
12/31/2025 Traffic control set-up approved between 9AM - 3:30PM
12/31/2025 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.