Permit: TR-ROW-1225-01566
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
3219 N CAMPBELL AV
Address NEW:
3219 N CAMPBELL AV
Apply Date:
12/29/2025
Applicant:
Desert Barricade / Eric Horne
Description:
**CONTINUATION OF TR-ROW-0725-00957**"Sewer Connection Work" Contractor will be working from the property line to lane 2. Pedestrian fencing will be in place, and the bike lane and sidewalk will be affected. Additional exploration and excavation are required for the new building's sewer tap.
Permit Reviews
Permit Number - TR-ROW-1225-01566
Permit Status: Complete
Permit Description: **CONTINUATION OF TR-ROW-0725-00957**"Sewer Connection Work"
Contractor will be working from the property line to lane 2. Pedestrian fencing will be in place, and the bike lane and sidewalk will be affected. Additional exploration and excavation are required for the new building's sewer tap.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/13/2026 | RIGHT-OF-WAY REVIEW v.2 | 01/14/2026 | APPROVED |
| 12/29/2025 | RIGHT-OF-WAY REVIEW v.1 | 12/30/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-1225-01566
Permit Status: Complete
Permit Description: **CONTINUATION OF TR-ROW-0725-00957**"Sewer Connection Work"
Contractor will be working from the property line to lane 2. Pedestrian fencing will be in place, and the bike lane and sidewalk will be affected. Additional exploration and excavation are required for the new building's sewer tap.
Total Outstanding Activity Conditions - 8
| Date | Name |
|---|---|
| 01/14/2026 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign. |
| 01/14/2026 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. jose.garcia@tucsonaz.gov Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 48 business hours before beginning work to coordinate impacts. |
| 01/14/2026 | The following extended traffic control set-up times were approved: |
| 01/14/2026 | Message Boards to be place 5 days in advance of start of work and to be active during all work. |
| 01/14/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 01/14/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 01/14/2026 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 01/14/2026 | Pre-Activity Meeting w/Inspections Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-1225-01566
Permit Description: **CONTINUATION OF TR-ROW-0725-00957**"Sewer Connection Work"
Contractor will be working from the property line to lane 2. Pedestrian fencing will be in place, and the bike lane and sidewalk will be affected. Additional exploration and excavation are required for the new building's sewer tap.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/01/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | PReactivity meeting held on original permit and on secondary permit all work completed, closing permits | |
| 04/01/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Yes third permit on this project see all previous inspections | |
| 04/01/2026 | TRSP - ROW - Final | Passed | All work completed for the right away |