Permit: TR-ROW-1225-01552
Permit Details
Status:
Withdrawn
Type:
Right-of-Way (ROW)
Address:
3955 N FLOWING WELLS RD
Address NEW:
3955 N FLOWING WELLS RD
Apply Date:
12/22/2025
Applicant:
Caitlin Ripley - Southwest Barricades
Description:
**WITHDRAWN- WORK COVERED UNDER PERMIT TR-UTL-0126-00062** Wanrack to bore 385' to place (1) 2" conduit. Place (4) 4x4 bore pits, place (2) new risers on pole 38.1 and pole 39 and place (1) new 30x48 HH.
Permit Reviews
Permit Number - TR-ROW-1225-01552
Permit Status: Withdrawn
Permit Description: **WITHDRAWN- WORK COVERED UNDER PERMIT TR-UTL-0126-00062** Wanrack to bore 385' to place (1) 2" conduit. Place (4) 4x4 bore pits, place (2) new risers on pole 38.1 and pole 39 and place (1) new 30x48 HH.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/22/2025 | RIGHT-OF-WAY REVIEW v.1 | 01/02/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-1225-01552
Permit Status: Withdrawn
Permit Description: **WITHDRAWN- WORK COVERED UNDER PERMIT TR-UTL-0126-00062** Wanrack to bore 385' to place (1) 2" conduit. Place (4) 4x4 bore pits, place (2) new risers on pole 38.1 and pole 39 and place (1) new 30x48 HH.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 12/22/2025 | Bus stop in the area, contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 at least 48-business hours prior to start of work for coordination. |
| 12/22/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 12/22/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 12/23/2025 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 12/23/2025 | Pre-Activity Meeting w/Inspections Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |