Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW)
Address:
355 N WILMOT RD
Address NEW:
355 N WILMOT RD
Apply Date:
12/16/2025
Applicant:
Andrew Ruiz
Description:
Removing approximately 1500sf of 4” thick concrete sidewalk and ramp then replacing. Contractor-HardRock Concrete Placement (not in system) Contact-Donna Wood 480-559-2242 ***

Permit Reviews

Permit Number - TR-ROW-1225-01535
Permit Status: Inspections
Permit Description: Removing approximately 1500sf of 4” thick concrete sidewalk and ramp then replacing. Contractor-HardRock Concrete Placement (not in system) Contact-Donna Wood 480-559-2242 ***
Start Date Submittal Complete Date Status  
12/16/2025 RIGHT-OF-WAY REVIEW v.1 12/19/2025 REQUIRES RESUBMIT Review Details
12/30/2025 RIGHT-OF-WAY REVIEW v.2 12/30/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-1225-01535
Permit Status: Inspections
Permit Description: Removing approximately 1500sf of 4” thick concrete sidewalk and ramp then replacing. Contractor-HardRock Concrete Placement (not in system) Contact-Donna Wood 480-559-2242 ***
Total Outstanding Activity Conditions - 7
Date Name
12/18/2025 Traffic control set-up approved between 9AM - 3:30PM
12/19/2025 Bike Lane Access and Accommodation Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign
12/19/2025 The following extended traffic control set-up times were approved: 24 hr. Closure
12/19/2025 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
12/19/2025 Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
12/19/2025 Pre-Activity Meeting w/Inspections Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING
12/19/2025 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TR-ROW-1225-01535
Permite Description: Removing approximately 1500sf of 4” thick concrete sidewalk and ramp then replacing. Contractor-HardRock Concrete Placement (not in system) Contact-Donna Wood 480-559-2242 ***
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
TRSP - ROW - Barricade - Setup/Routine N/A Requested
01/09/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting N/A Deferred

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
355 N WILMOT RD SITE_V1.PDF DOCUMENTS VIEW
355 N WILMOT RD TCP1_V1.PDF DOCUMENTS VIEW