Permit: TR-ROW-1225-01532
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
1413 N THUNDER RIDGE DR
Address NEW:
1413 N THUNDER RIDGE DR
Apply Date:
12/16/2025
Applicant:
ALICIA OROZCO
Description:
DELIVERY OF 1-40 YRD ROLL OFF ON 01/15/26 AND REMOVED ON 1/20/2026 / WILL BE PLACED EAST OF THIS ADDRESS
Permit Reviews
Permit Number - TR-ROW-1225-01532
Permit Status: Complete
Permit Description: DELIVERY OF 1-40 YRD ROLL OFF ON 01/15/26 AND REMOVED ON 1/20/2026 / WILL BE PLACED EAST OF THIS ADDRESS
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/16/2025 | RIGHT-OF-WAY REVIEW v.1 | 12/17/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-1225-01532
Permit Status: Complete
Permit Description: DELIVERY OF 1-40 YRD ROLL OFF ON 01/15/26 AND REMOVED ON 1/20/2026 / WILL BE PLACED EAST OF THIS ADDRESS
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 12/17/2025 | Traffic Control set-up approved between 7AM - 5PM |
| 12/17/2025 | DUMPSTERS AND OTHER HAZARDS BARRICADES ARE REQUIRED AT ALL TIMES FOR ROLL OR PODS PLACED IN THE CITY R.O.W Roll-offs/dumpsters/pods 1. Roll-offs or Dumpsters shall be located in areas that are not within a drainageway, storm runoff flow line, or obstructing storm drain infrastructure. 2. Roll-offs or Dumpsters shall keep lids on so that roll-off or dumpsters is kept covered when not in use. Plugs shall be kept in place. 3. Roll-offs or dumpsters that have openings at sides shall have sealed side door flaps that are kept closed so that waste liquids do not leave container. 4. Damaged containers shall be reported for replacement. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-1225-01532
Permit Description: DELIVERY OF 1-40 YRD ROLL OFF ON 01/15/26 AND REMOVED ON 1/20/2026 / WILL BE PLACED EAST OF THIS ADDRESS
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/12/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 02/12/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 02/12/2026 | TRSP - ROW - Final | Passed |