Permit: TR-ROW-1225-01499
Permit Details
Apply Date:
12/09/2025
Applicant:
ANGEL MORALES
Description:
Asphalt patches 2”D X 10’W X 48’L.***
Permit Reviews
Permit Number - TR-ROW-1225-01499
Permit Status: Complete
Permit Description: Asphalt patches 2”D X 10’W X 48’L.***
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/21/2025 | RIGHT-OF-WAY REVIEW v.2 | 12/22/2025 | REQUIRES RESUBMIT |
| 01/28/2026 | RIGHT-OF-WAY REVIEW v.3 | 01/30/2026 | APPROVED |
| 12/10/2025 | RIGHT-OF-WAY REVIEW v.1 | 12/15/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-1225-01499
Permit Status: Complete
Permit Description: Asphalt patches 2”D X 10’W X 48’L.***
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 01/29/2026 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign |
| 01/29/2026 | Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 48 business hours before beginning work to coordinate impacts |
| 01/29/2026 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual |
| 12/10/2025 | PRE-CON/SIDEWALK |
| 12/10/2025 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-1225-01499
Permit Description: Asphalt patches 2”D X 10’W X 48’L.***
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/17/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 03/17/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 03/17/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 03/17/2026 | TRSP - ROW - Final | Passed |