Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
3570 S 6TH AV
Address NEW:
3570 S 6TH AV
Apply Date:
12/05/2025
Applicant:
ANGEL MORALES
Description:
All work is in the middle (two-way turn lane) Remove and Replace Asphalt. Remove Approx 450 SF of asphalt and Concrete, 2 ½ inches +/- .Install 6 inches of ABC- Compacted. Pave with 3 inches of PAG 2 LV. Work includes Striping. All work to be completed in one day. No night work. Excav-12 X 9 City of Tucson project: CoT FTY26 6th Ave Concrete REV2 City Contact: Eric Ross (520-400-2377)

Permit Reviews

Permit Number - TR-ROW-1225-01469
Permit Status: Complete
Permit Description: All work is in the middle (two-way turn lane) Remove and Replace Asphalt. Remove Approx 450 SF of asphalt and Concrete, 2 ½ inches +/- .Install 6 inches of ABC- Compacted. Pave with 3 inches of PAG 2 LV. Work includes Striping. All work to be completed in one day. No night work. Excav-12 X 9 City of Tucson project: CoT FTY26 6th Ave Concrete REV2 City Contact: Eric Ross (520-400-2377)
Start Date Submittal Complete Date Status  
12/05/2025 RIGHT-OF-WAY REVIEW v.1 12/17/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-1225-01469
Permit Status: Complete
Permit Description: All work is in the middle (two-way turn lane) Remove and Replace Asphalt. Remove Approx 450 SF of asphalt and Concrete, 2 ½ inches +/- .Install 6 inches of ABC- Compacted. Pave with 3 inches of PAG 2 LV. Work includes Striping. All work to be completed in one day. No night work. Excav-12 X 9 City of Tucson project: CoT FTY26 6th Ave Concrete REV2 City Contact: Eric Ross (520-400-2377)
Total Outstanding Activity Conditions - 4
Date Name
12/08/2025 Traffic control set-up approved between 9AM - 3:30PM
12/17/2025 The following extended traffic control set-up times were approved:
12/17/2025
12/17/2025

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-1225-01469
Permit Description: All work is in the middle (two-way turn lane) Remove and Replace Asphalt. Remove Approx 450 SF of asphalt and Concrete, 2 ½ inches +/- .Install 6 inches of ABC- Compacted. Pave with 3 inches of PAG 2 LV. Work includes Striping. All work to be completed in one day. No night work. Excav-12 X 9 City of Tucson project: CoT FTY26 6th Ave Concrete REV2 City Contact: Eric Ross (520-400-2377)
Total Completed Inspections - 1
Date Description Inspector Results Comments
01/09/2026 TRSP - ROW - Final Passed

Documents

File Name Document Type  
SUNLAND - 3570 S 6TH AVE - LEFT LANE CL PLAN 2 - 44075_V1.PDF DOCUMENTS VIEW
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
SUNLAND - 3570 S 6TH AVE - LEFT LANE CL PLAN 2 - 44075_V1.PDF DOCUMENTS VIEW
SUNLAND - 3570 S 6TH AVE -SITE - 44075_V1.PDF DOCUMENTS VIEW