Permit: TR-ROW-1225-01464
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
244 W FLORES ST BLDG 1
Address NEW:
244 W FLORES ST BLDG 1
Apply Date:
12/04/2025
Applicant:
Nicholas Tomko
Description:
Construction of sidewalks and curbs and asphalt in front of 244 w Flores st parking lot on the south side of property. Work Related to DP22-0101 (244 W FLORES ST TUCSON, AZ 85705)
Permit Reviews
Permit Number - TR-ROW-1225-01464
Permit Status: Complete
Permit Description: Construction of sidewalks and curbs and asphalt in front of 244 w Flores st parking lot on the south side of property.
Work Related to DP22-0101 (244 W FLORES ST TUCSON, AZ 85705)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/19/2025 | RIGHT-OF-WAY REVIEW v.3 | 01/22/2026 | REQUIRES RESUBMIT |
| 12/10/2025 | RIGHT-OF-WAY REVIEW v.2 | 12/18/2025 | REQUIRES RESUBMIT |
| 12/04/2025 | RIGHT-OF-WAY REVIEW v.1 | 12/09/2025 | REQUIRES RESUBMIT |
| 01/28/2026 | RIGHT-OF-WAY REVIEW v.4 | 01/28/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-1225-01464
Permit Status: Complete
Permit Description: Construction of sidewalks and curbs and asphalt in front of 244 w Flores st parking lot on the south side of property.
Work Related to DP22-0101 (244 W FLORES ST TUCSON, AZ 85705)
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 12/11/2025 | Traffic Control set-up approved between 7AM - 5PM |
| 12/11/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 12/11/2025 | Please see attachment for storm to shade condition |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-1225-01464
Permit Description: Construction of sidewalks and curbs and asphalt in front of 244 w Flores st parking lot on the south side of property.
Work Related to DP22-0101 (244 W FLORES ST TUCSON, AZ 85705)
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/03/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 03/06/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | Working the right of way has stopped until they can get it on the schedule to do future work in the right away. They are currently working on the inside of the building and are no longer doing any work in the right of way. They are going to be getting a new permit when they get it on the schedule for the driveway entrance to be redone and sidewalk improvements to be done closing permit | |
| 03/06/2026 | TRSP - ROW - Final | Passed | Working the right of way has stopped until they can get it on the schedule to do future work in the right away. They are currently working on the inside of the building and are no longer doing any work in the right of way. They are going to be getting a new permit when they get it on the schedule for the driveway entrance to be redone and sidewalk improvements to be done closing permit |