Permit: TR-ROW-1225-01451
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
1992 E SILVERLAKE RD
Address NEW:
1992 E SILVERLAKE RD
Apply Date:
12/01/2025
Applicant:
Dan Padilla
Description:
Air-Vacuum Excavation of 14 utility potholes for the design phase of Silverlake Road, Cherrybell Stravenue, and Fairland Avenue Water Modification Project. 03/17/2026 - Request for 60 Day Renewal as of 03/21/2026
Permit Reviews
Permit Number - TR-ROW-1225-01451
Permit Status: Complete
Permit Description: Air-Vacuum Excavation of 14 utility potholes for the design phase of Silverlake Road, Cherrybell Stravenue, and Fairland Avenue Water Modification Project.
03/17/2026 - Request for 60 Day Renewal as of 03/21/2026
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/01/2025 | RIGHT-OF-WAY REVIEW v.1 | 02/18/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-1225-01451
Permit Status: Complete
Permit Description: Air-Vacuum Excavation of 14 utility potholes for the design phase of Silverlake Road, Cherrybell Stravenue, and Fairland Avenue Water Modification Project.
03/17/2026 - Request for 60 Day Renewal as of 03/21/2026
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 12/02/2025 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-ROW-1225-01451
Permite Description: Air-Vacuum Excavation of 14 utility potholes for the design phase of Silverlake Road, Cherrybell Stravenue, and Fairland Avenue Water Modification Project.
03/17/2026 - Request for 60 Day Renewal as of 03/21/2026
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/20/2026 | TRSP - ROW - Final | N/A | Canceled |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-1225-01451
Permit Description: Air-Vacuum Excavation of 14 utility potholes for the design phase of Silverlake Road, Cherrybell Stravenue, and Fairland Avenue Water Modification Project.
03/17/2026 - Request for 60 Day Renewal as of 03/21/2026
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/17/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 06/17/2026 | TRSP - ROW - SITE INSPECTION | Passed |