Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-ROW-1224-01473
Permit Details
Apply Date:
12/31/2024
Applicant:
Andrew Ruiz
Description:
Sidewalk and Driveway improvements for Southern Tire Mart***
Permit Reviews
Permit Number - TR-ROW-1224-01473
Permit Status: Inspections
Permit Description: Sidewalk and Driveway improvements for Southern Tire Mart***
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
12/31/2024 | RIGHT-OF-WAY REVIEW v.1 | 01/03/2025 | REQUIRES RESUBMIT |
01/07/2025 | RIGHT-OF-WAY REVIEW v.2 | 01/07/2025 | REQUIRES RESUBMIT |
01/09/2025 | RIGHT-OF-WAY REVIEW v.3 | 01/10/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-1224-01473
Permit Status: Inspections
Permit Description: Sidewalk and Driveway improvements for Southern Tire Mart***
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
01/02/2025 | PRE-CON/PAVEMENT/SIDEWALK |
01/02/2025 | sidewalk/ driveway |
01/02/2025 | Traffic control set-up approved between 9AM - 3:30PM |
01/10/2025 | PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRA PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. |
01/10/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-ROW-1224-01473
Permit Description: Sidewalk and Driveway improvements for Southern Tire Mart***
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/16/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | contractor will start on site driveways, RCP will run under driveways within the right of way, will provide standard details to follow. Right of way work outside of perimeter fence will not start for additional four weeks. |