Permit: TR-ROW-1224-01455
Permit Details
Apply Date:
12/23/2024
Applicant:
Rene Andrade - Desert Barricades
Description:
Digging 20 LF in AC and 10 LF in dirt for new sewer connection
Permit Reviews
Permit Number - TR-ROW-1224-01455
Permit Status: Complete
Permit Description: Digging 20 LF in AC and 10 LF in dirt for new sewer connection
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/23/2024 | RIGHT-OF-WAY REVIEW v.1 | 12/27/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-1224-01455
Permit Status: Complete
Permit Description: Digging 20 LF in AC and 10 LF in dirt for new sewer connection
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 12/27/2024 | Traffic Control set-up approved between 7AM - 5PM |
| 12/27/2024 | PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-ROW-1224-01455
Permite Description: Digging 20 LF in AC and 10 LF in dirt for new sewer connection
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/07/2025 | TRSP - ROW - Paving - Subgrade/removal/placement | N/A | Re-inspection required | |
| 03/07/2025 | TRSP - ROW - Final | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-1224-01455
Permit Description: Digging 20 LF in AC and 10 LF in dirt for new sewer connection
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/03/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 03/07/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 03/07/2025 | TRSP - ROW - Barricade Takedown | Passed | ||
| 07/28/2025 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
| 07/28/2025 | TRSP - ROW - Final | Passed |