Permit Details

Status:
Issued
Type:
Right-of-Way (ROW)
Apply Date:
12/20/2024
Applicant:
Miguel Gonzalez
Description:
Maintenance permit, At existing Zayo HH locations an extra HH will be placed. Continue pull along, Park ave. STA 192+50. Place Zayo HH at STA 192+60, continue pull to STA 198+90, Place Zayo HH at STA 199+00. Pull cable through existing conduit to STA 226+90, place Zayo HH continue pull to STA 234+45. 2 Handholes to be placed in sidewalk / concrete

Permit Reviews

Permit Number - TR-ROW-1224-01450
Permit Status: Issued
Permit Description: Maintenance permit, At existing Zayo HH locations an extra HH will be placed. Continue pull along, Park ave. STA 192+50. Place Zayo HH at STA 192+60, continue pull to STA 198+90, Place Zayo HH at STA 199+00. Pull cable through existing conduit to STA 226+90, place Zayo HH continue pull to STA 234+45. 2 Handholes to be placed in sidewalk / concrete
Start Date Submittal Complete Date Status  
01/13/2025 RIGHT-OF-WAY REVIEW v.3 01/13/2025 APPROVED Review Details
12/23/2024 RIGHT-OF-WAY REVIEW v.1 12/26/2024 REQUIRES RESUBMIT Review Details
01/03/2025 RIGHT-OF-WAY REVIEW v.2 01/06/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-1224-01450
Permit Status: Issued
Permit Description: Maintenance permit, At existing Zayo HH locations an extra HH will be placed. Continue pull along, Park ave. STA 192+50. Place Zayo HH at STA 192+60, continue pull to STA 198+90, Place Zayo HH at STA 199+00. Pull cable through existing conduit to STA 226+90, place Zayo HH continue pull to STA 234+45. 2 Handholes to be placed in sidewalk / concrete
Total Outstanding Activity Conditions - 4
Date Name
01/03/2025 Traffic control set-up approved between 9AM - 3:30PM
01/03/2025 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
01/03/2025 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
01/13/2025 Rolling shadow traffic control closures not to exceed 2 hrs in a single location, with on site flaggers for right of way with less than 2 travel lanes in each direction. Closure to exceed 2 hrs will require full traffic control setups based on road configuration.

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
LIGHTWORKS5-TCP-011025_V1.PDF DOCUMENTS VIEW
SEG 0 -TUCSON METRO OP_5_010325_V1.PDF DOCUMENTS VIEW