Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
705 E 17TH ST
Address NEW:
705 E 17TH ST
Apply Date:
12/20/2024
Applicant:
Miguel Gonzalez
Description:
Maintance Permits for project: possible dig ups, for conduit crushed pipes. resume pulling cable to STA 44+90. Place Zayo HH at STA 45+00. resume pulling cable through existing duct to STA 62+00. Place Zayo HH at STA 62+10. Continue cable pull to STA 88+90. Place Zayo HH at 89+00. From Toole to Euclid and 22nd st, To place 5 new handholes in concrete. 4 handholes to be placed in dirt.

Permit Reviews

Permit Number - TR-ROW-1224-01447
Permit Status: Complete
Permit Description: Maintance Permits for project: possible dig ups, for conduit crushed pipes. resume pulling cable to STA 44+90. Place Zayo HH at STA 45+00. resume pulling cable through existing duct to STA 62+00. Place Zayo HH at STA 62+10. Continue cable pull to STA 88+90. Place Zayo HH at 89+00. From Toole to Euclid and 22nd st, To place 5 new handholes in concrete. 4 handholes to be placed in dirt.
Start Date Submittal Complete Date Status  
01/13/2025 RIGHT-OF-WAY REVIEW v.3 01/13/2025 APPROVED Review Details
01/03/2025 RIGHT-OF-WAY REVIEW v.2 01/06/2025 REQUIRES RESUBMIT Review Details
12/23/2024 RIGHT-OF-WAY REVIEW v.1 12/26/2024 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-1224-01447
Permit Status: Complete
Permit Description: Maintance Permits for project: possible dig ups, for conduit crushed pipes. resume pulling cable to STA 44+90. Place Zayo HH at STA 45+00. resume pulling cable through existing duct to STA 62+00. Place Zayo HH at STA 62+10. Continue cable pull to STA 88+90. Place Zayo HH at 89+00. From Toole to Euclid and 22nd st, To place 5 new handholes in concrete. 4 handholes to be placed in dirt.
Total Outstanding Activity Conditions - 5
Date Name
01/13/2025 Traffic control set-up approved between 9AM - 3:30PM
01/13/2025 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
01/13/2025 PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL.
01/13/2025 Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
01/13/2025 Rolling shadow traffic control closures not to exceed 2 hrs in a single location, with on site flaggers for right of way with less than 2 travel lanes in each direction. Closure to exceed 2 hrs will require full traffic control setups based on road configuration.

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-1224-01447
Permit Description: Maintance Permits for project: possible dig ups, for conduit crushed pipes. resume pulling cable to STA 44+90. Place Zayo HH at STA 45+00. resume pulling cable through existing duct to STA 62+00. Place Zayo HH at STA 62+10. Continue cable pull to STA 88+90. Place Zayo HH at 89+00. From Toole to Euclid and 22nd st, To place 5 new handholes in concrete. 4 handholes to be placed in dirt.
Total Completed Inspections - 5
Date Description Inspector Results Comments
03/26/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
04/21/2025 TRSP - ROW - Barricade - Setup/Routine Passed
04/21/2025 TRSP - ROW - Barricade Takedown Passed
04/21/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
07/09/2025 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
LIGHTWORKS2-TCP-011025_V1.PDF DOCUMENTS VIEW
SEG 0 -TUCSON METRO OP_MILE 2_07-18-24_V1.PDF DOCUMENTS VIEW