Permit: TR-ROW-1224-01407
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
2406 E HAWTHORNE ST
Address NEW:
2406 E HAWTHORNE ST
Apply Date:
12/09/2024
Applicant:
Jason Tanzillo
Description:
Placement of roll off dumpster on west side of property for construction debris for a residential remodel.
Permit Reviews
Permit Number - TR-ROW-1224-01407
Permit Status: Complete
Permit Description: Placement of roll off dumpster on west side of property for construction debris for a residential remodel.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/09/2024 | RIGHT-OF-WAY REVIEW REVISION v.1 | 01/13/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-1224-01407
Permit Status: Complete
Permit Description: Placement of roll off dumpster on west side of property for construction debris for a residential remodel.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 01/13/2025 | The following extended traffic control set-up times were approved: |
| 01/13/2025 | 1) Roll-offs or dumpsters shall be located in areas that are not within a drainageway, storm runoff flow line, or obstructing storm drain infrastructure. 2) Roll-offs or dumpsters shall keep lids on so that roll-off or dumpster is kept covered when not in use. Plugs shall be kept in place. 3) Roll-offs or dumpsters that have openings at sides shall have sealed side door flaps that are kept closed so that waste liquids do not leave container. 4) Damaged containers shall be reported for replacement. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-ROW-1224-01407
Permite Description: Placement of roll off dumpster on west side of property for construction debris for a residential remodel.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/15/2025 | TRSP - ROW - Final | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-1224-01407
Permit Description: Placement of roll off dumpster on west side of property for construction debris for a residential remodel.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/19/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 07/10/2025 | TRSP - ROW - Final | Passed |