Permit: TR-ROW-1224-01400
Permit Details
Apply Date:
12/06/2024
Applicant:
Erica Goldston
Description:
Remove existing CO and furnish and install a new 48" MH. Furnish & Install new frame and cover. Install new concrete collar. Excavate and complete replacement of 6" VCP sewer main to 6" PVC. This is associated with the Prop 101 Rehab Package 5 Project.
Permit Reviews
Permit Number - TR-ROW-1224-01400
Permit Status: Complete
Permit Description: Remove existing CO and furnish and install a new 48" MH. Furnish & Install new frame and cover. Install new concrete collar. Excavate and complete replacement of 6" VCP sewer main to 6" PVC. This is associated with the Prop 101 Rehab Package 5 Project.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/09/2024 | RIGHT-OF-WAY REVIEW v.1 | 12/12/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-1224-01400
Permit Status: Complete
Permit Description: Remove existing CO and furnish and install a new 48" MH. Furnish & Install new frame and cover. Install new concrete collar. Excavate and complete replacement of 6" VCP sewer main to 6" PVC. This is associated with the Prop 101 Rehab Package 5 Project.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 12/11/2024 | The following extended traffic control set-up times were approved: |
| 12/11/2024 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-1224-01400
Permit Description: Remove existing CO and furnish and install a new 48" MH. Furnish & Install new frame and cover. Install new concrete collar. Excavate and complete replacement of 6" VCP sewer main to 6" PVC. This is associated with the Prop 101 Rehab Package 5 Project.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/17/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 02/13/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 02/13/2025 | TRSP - ROW - Barricade Takedown | Passed | ||
| 02/13/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 02/13/2025 | TRSP - ROW - Final | Passed |