Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
4242 E 5TH ST
Address NEW:
4242 E 5TH ST
Apply Date:
12/06/2024
Applicant:
Erica Goldston
Description:
Remove existing CO and furnish and install a new 48" MH. Furnish & Install new frame and cover. Install new concrete collar. Excavate and complete replacement of 6" VCP sewer main to 6" PVC. This is associated with the Prop 101 Rehab Package 5 Project.

Permit Reviews

Permit Number - TR-ROW-1224-01400
Permit Status: Complete
Permit Description: Remove existing CO and furnish and install a new 48" MH. Furnish & Install new frame and cover. Install new concrete collar. Excavate and complete replacement of 6" VCP sewer main to 6" PVC. This is associated with the Prop 101 Rehab Package 5 Project.
Start Date Submittal Complete Date Status  
12/09/2024 RIGHT-OF-WAY REVIEW v.1 12/12/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-1224-01400
Permit Status: Complete
Permit Description: Remove existing CO and furnish and install a new 48" MH. Furnish & Install new frame and cover. Install new concrete collar. Excavate and complete replacement of 6" VCP sewer main to 6" PVC. This is associated with the Prop 101 Rehab Package 5 Project.
Total Outstanding Activity Conditions - 2
Date Name
12/11/2024 The following extended traffic control set-up times were approved:
12/11/2024 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-1224-01400
Permit Description: Remove existing CO and furnish and install a new 48" MH. Furnish & Install new frame and cover. Install new concrete collar. Excavate and complete replacement of 6" VCP sewer main to 6" PVC. This is associated with the Prop 101 Rehab Package 5 Project.
Total Completed Inspections - 5
Date Description Inspector Results Comments
12/17/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
02/13/2025 TRSP - ROW - Barricade - Setup/Routine Passed
02/13/2025 TRSP - ROW - Barricade Takedown Passed
02/13/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
02/13/2025 TRSP - ROW - Final Passed