Permit: TR-ROW-1224-01390
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
4545 E VALENCIA RD
Address NEW:
4545 E VALENCIA RD
Apply Date:
12/03/2024
Applicant:
Andrew Ruiz
Description:
8” Watermain Line Extension for new project site (24 Hour Closures) Excav = 800ft *** Related permit #TR-ROW-1124-01355
Permit Reviews
Permit Number - TR-ROW-1224-01390
Permit Status: Complete
Permit Description: 8” Watermain Line Extension for new project site (24 Hour Closures)
Excav = 800ft ***
Related permit #TR-ROW-1124-01355
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/03/2024 | RIGHT-OF-WAY REVIEW v.1 | 12/05/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-1224-01390
Permit Status: Complete
Permit Description: 8” Watermain Line Extension for new project site (24 Hour Closures)
Excav = 800ft ***
Related permit #TR-ROW-1124-01355
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 12/03/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 12/03/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 12/05/2024 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-ROW-1224-01390
Permite Description: 8” Watermain Line Extension for new project site (24 Hour Closures)
Excav = 800ft ***
Related permit #TR-ROW-1124-01355
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/21/2025 | TRSP - ROW - Final | N/A | Re-inspection required | The final pavement repair has not been completed, there is still a steel plate in the road, and the sidewalk ramp has cold mix instead of concrete. This permit is expired. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-1224-01390
Permit Description: 8” Watermain Line Extension for new project site (24 Hour Closures)
Excav = 800ft ***
Related permit #TR-ROW-1124-01355
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/25/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | met on site with John and Mike from Clark construction. Work to begin on waterline within one or two weeks one street sign to be removed and replaced and two plants to be removed and replaced. | |
| 03/18/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | Traffic control was set up according to the TCP. | |
| 03/18/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Compaction is good, awaiting final pavement patch and sidewalk repair. | |
| 06/16/2025 | TRSP - ROW - Final | Passed | Final pavement repair has been completed |