Permit: TR-ROW-1223-01467
Permit Details
Apply Date:
12/19/2023
Applicant:
Austin Wesnitzer
Description:
Will Be working in 1 neighborhoods. All streets within Ft Lowell / Oracle / Glenn / Stone.
Permit Reviews
Permit Number - TR-ROW-1223-01467
Permit Status: Complete
Permit Description: Will Be working in 1 neighborhoods. All streets within Ft Lowell / Oracle / Glenn / Stone.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/19/2023 | RIGHT-OF-WAY REVIEW v.1 | 01/18/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-1223-01467
Permit Status: Complete
Permit Description: Will Be working in 1 neighborhoods. All streets within Ft Lowell / Oracle / Glenn / Stone.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 12/19/2023 | BUS STOP IN AREA, CONTACT SUN TRAN DISPATCH AT 520-206-8934 AT LEAST 48-BUISNESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 12/19/2023 | Traffic Control set-up approved between 7AM - 5PM |
| 12/19/2023 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-1223-01467
Permit Description: Will Be working in 1 neighborhoods. All streets within Ft Lowell / Oracle / Glenn / Stone.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/26/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 03/26/2024 | TRSP - ROW - Final/Close-Out | Passed |