Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
10355 E 29TH ST
Apply Date:
12/18/2023
Applicant:
Jaime Rivera
Description:
323037 Site 1 - Point repair to remove and replace damaged 8" ACP located between 202' and 205' from upstream manhole. Install Approximately 300 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth.

Permit Reviews

Permit Number - TR-ROW-1223-01464
Permit Status: Complete
Permit Description: 323037 Site 1 - Point repair to remove and replace damaged 8" ACP located between 202' and 205' from upstream manhole. Install Approximately 300 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth.
Start Date Submittal Complete Date Status  
12/18/2023 RIGHT-OF-WAY REVIEW v.1 12/21/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-1223-01464
Permit Status: Complete
Permit Description: 323037 Site 1 - Point repair to remove and replace damaged 8" ACP located between 202' and 205' from upstream manhole. Install Approximately 300 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth.
Total Outstanding Activity Conditions - 2
Date Name
12/18/2023 Traffic Control set-up approved between 7AM - 5PM
12/18/2023 Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual.

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-1223-01464
Permit Description: 323037 Site 1 - Point repair to remove and replace damaged 8" ACP located between 202' and 205' from upstream manhole. Install Approximately 300 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth.
Total Completed Inspections - 2
Date Description Inspector Results Comments
01/05/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
04/29/2024 TRSP - ROW - Final/Close-Out Passed site complete. moratorium patch made.

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
323037 - SITE 1 FMP MAP (10300 E 29TH ST)_V1.PDF DOCUMENTS VIEW
DB 68812 - PAGE 1 - 10449 E. 29TH ST - 2 WAY FLAGGER - 323037_V1.PDF DOCUMENTS VIEW