Permit: TR-ROW-1223-01442
Permit Details
Apply Date:
12/12/2023
Applicant:
Description:
New connecting sewer service line to a county main and by passing a failed septic..
Permit Reviews
Permit Number - TR-ROW-1223-01442
Permit Status: Complete
Permit Description: New connecting sewer service line to a county main and by passing a failed septic..
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/12/2023 | RIGHT-OF-WAY REVIEW v.1 | 12/13/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-1223-01442
Permit Status: Complete
Permit Description: New connecting sewer service line to a county main and by passing a failed septic..
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 12/13/2023 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 12/13/2023 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-1223-01442
Permit Description: New connecting sewer service line to a county main and by passing a failed septic..
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/27/2023 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 12/29/2023 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
| 12/29/2023 | TRSP - ROW - Bituminous Treatment | Passed | ||
| 03/20/2024 | TRSP - ROW - Notice of Completion | Passed |