Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-ROW-1223-01434
Permit Details
Apply Date:
12/07/2023
Applicant:
Jason Reynolds
Description:
(Permit Renewed/Extended for 60 day as of 1/06/2024 as requested ) - House flooded. Contents from the home are being stored temporarily in a storage container in front of the home until the damage is fixed. Contractors say they will be done in about 3-4 weeks.
Permit Reviews
Permit Number - TR-ROW-1223-01434
Permit Status: Complete
Permit Description: (Permit Renewed/Extended for 60 day as of 1/06/2024 as requested ) - House flooded. Contents from the home are being stored temporarily in a storage container in front of the home until the damage is fixed. Contractors say they will be done in about 3-4 weeks.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/08/2023 | RIGHT-OF-WAY REVIEW v.1 | 12/08/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-1223-01434
Permit Status: Complete
Permit Description: (Permit Renewed/Extended for 60 day as of 1/06/2024 as requested ) - House flooded. Contents from the home are being stored temporarily in a storage container in front of the home until the damage is fixed. Contractors say they will be done in about 3-4 weeks.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 12/08/2023 | The following extended traffic control set-up times were approved: |
| 12/08/2023 | 1) Roll-offs or dumpsters shall be located in areas that are not within a drainageway, storm runoff flow line, or obstructing storm drain infrastructure. 2) Roll-offs or dumpsters shall keep lids on so that roll-off or dumpster is kept covered when not in use. Plugs shall be kept in place. 3) Roll-offs or dumpsters that have openings at sides shall have sealed side door flaps that are kept closed so that waste liquids do not leave container. 4) Damaged containers shall be reported for replacement. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-ROW-1223-01434
Permite Description: (Permit Renewed/Extended for 60 day as of 1/06/2024 as requested ) - House flooded. Contents from the home are being stored temporarily in a storage container in front of the home until the damage is fixed. Contractors say they will be done in about 3-4 weeks.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/11/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-1223-01434
Permit Description: (Permit Renewed/Extended for 60 day as of 1/06/2024 as requested ) - House flooded. Contents from the home are being stored temporarily in a storage container in front of the home until the damage is fixed. Contractors say they will be done in about 3-4 weeks.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/11/2024 | TRSP - ROW - Final/Close-Out | Passed |