Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
744 E 39TH ST
Address NEW:
744 E 39TH ST
Apply Date:
12/05/2023
Applicant:
Daniel Bradshaw
Description:
The Department of Parks and Recreation would like to use one of their JOC's to add a wheelchair accessible ramp leading from the right of way onto an existing sidewalk.

Permit Reviews

Permit Number - TR-ROW-1223-01431
Permit Status: Complete
Permit Description: The Department of Parks and Recreation would like to use one of their JOC's to add a wheelchair accessible ramp leading from the right of way onto an existing sidewalk.
Start Date Submittal Complete Date Status  
12/06/2023 RIGHT-OF-WAY REVIEW v.1 12/14/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-1223-01431
Permit Status: Complete
Permit Description: The Department of Parks and Recreation would like to use one of their JOC's to add a wheelchair accessible ramp leading from the right of way onto an existing sidewalk.
Total Outstanding Activity Conditions - 2
Date Name
12/06/2023 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
12/06/2023 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-1223-01431
Permit Description: The Department of Parks and Recreation would like to use one of their JOC's to add a wheelchair accessible ramp leading from the right of way onto an existing sidewalk.
Total Completed Inspections - 3
Date Description Inspector Results Comments
04/03/2024 TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) Passed
07/26/2024 TRSP - ROW - SITE INSPECTION Passed
04/29/2025 TRSP - ROW - Concrete - Acceptance (Post-Pour) Passed