Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Apply Date:
12/15/2022
Applicant:
Cameron Bonner
Description:
Site 4 - Install Approximately 260 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and manhole rehabilitations will be completed on MH's 8506-05 and MH 8506-04 per PCRWRD standard detail 211/212.

Permit Reviews

Permit Number - TR-ROW-1222-00163
Permit Status: Complete
Permit Description: Site 4 - Install Approximately 260 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and manhole rehabilitations will be completed on MH's 8506-05 and MH 8506-04 per PCRWRD standard detail 211/212.
Start Date Submittal Complete Date Status  
12/20/2022 RIGHT-OF-WAY REVIEW v.1 01/04/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-1222-00163
Permit Status: Complete
Permit Description: Site 4 - Install Approximately 260 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and manhole rehabilitations will be completed on MH's 8506-05 and MH 8506-04 per PCRWRD standard detail 211/212.
Total Outstanding Activity Conditions - 1
Date Name
01/04/2023 ALLEY

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-1222-00163
Permit Description: Site 4 - Install Approximately 260 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and manhole rehabilitations will be completed on MH's 8506-05 and MH 8506-04 per PCRWRD standard detail 211/212.
Total Completed Inspections - 1
Date Description Inspector Results Comments
04/10/2023 TRSP - ROW - Final/Close-Out Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW