Permit: TR-ROW-1222-00159
Permit Details
Apply Date:
12/15/2022
Applicant:
Cameron Bonner
Description:
Sites 1 and 2 - Install Approximately 494 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and bench rehabilitation will be completed on MH 8910-08, MH 8910-09, MH 8910-10, and MH 8910-11 per PCRWRD standard detail 211/212.
Permit Reviews
Permit Number - TR-ROW-1222-00159
Permit Status: Complete
Permit Description: Sites 1 and 2 - Install Approximately 494 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and bench rehabilitation will be completed on MH 8910-08, MH 8910-09, MH 8910-10, and MH 8910-11 per PCRWRD standard detail 211/212.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/20/2022 | RIGHT-OF-WAY REVIEW v.1 | 01/04/2023 | APPROVED |
Conditions
Permit Number - TR-ROW-1222-00159
Permit Status: Complete
Permit Description: Sites 1 and 2 - Install Approximately 494 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and bench rehabilitation will be completed on MH 8910-08, MH 8910-09, MH 8910-10, and MH 8910-11 per PCRWRD standard detail 211/212.
| Date | Description | Comments |
|---|---|---|
| 01/04/2023 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. | |
| 01/04/2023 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-1222-00159
Permit Description: Sites 1 and 2 - Install Approximately 494 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and bench rehabilitation will be completed on MH 8910-08, MH 8910-09, MH 8910-10, and MH 8910-11 per PCRWRD standard detail 211/212.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/11/2023 | TRSP - ROW - Final/Close-Out | Passed | ||
| 05/11/2023 | TRSP - ROW - SITE INSPECTION | Passed |