Status:
Needs Resubmittal
Type:
Right-of-Way (ROW)
Address NEW:
3015 E SPEEDWAY BL
Apply Date:
11/12/2026
Applicant:
Antonio Lopez - National Barricade Company
Description:
Please Expedite Permit. Scope of Work: Asphalt Milling and Paving • Project Overview: Crews will perform full-depth or surface asphalt milling and repaving across the designated parking lot and drive lanes surrounding the main commercial building. • Total Work Area: Approximately 32,149 square feet of asphalt surface, highlighted in red in the aerial site plan. This covers the northern drive lane, the western parking stalls and access area, the main southern parking lot, and the eastern parking strip. • Schedule & Duration: Work is scheduled to take place continuously overnight, starting at 5:00 AM on Tuesday, December 15, 2026, and concluding at 6:00 AM on Wednesday, December 16, 2026 (a 25-hour window). • Site Impact: All vehicles must be cleared from the highlighted red zones prior to 5:00 AM on December 15. Access to the shaded parking stalls and perimeter drive lanes will be restricted while heavy milling equipment, paving machines, and rollers are operating. Holiday Work restriction will be in place but no impact to travel lanes including Bus Stop & Bike path.

Permit Reviews

Permit Number - TR-ROW-1126-01263
Permit Status: Needs resubmittal
Permit Description: Please Expedite Permit. Scope of Work: Asphalt Milling and Paving • Project Overview: Crews will perform full-depth or surface asphalt milling and repaving across the designated parking lot and drive lanes surrounding the main commercial building. • Total Work Area: Approximately 32,149 square feet of asphalt surface, highlighted in red in the aerial site plan. This covers the northern drive lane, the western parking stalls and access area, the main southern parking lot, and the eastern parking strip. • Schedule & Duration: Work is scheduled to take place continuously overnight, starting at 5:00 AM on Tuesday, December 15, 2026, and concluding at 6:00 AM on Wednesday, December 16, 2026 (a 25-hour window). • Site Impact: All vehicles must be cleared from the highlighted red zones prior to 5:00 AM on December 15. Access to the shaded parking stalls and perimeter drive lanes will be restricted while heavy milling equipment, paving machines, and rollers are operating. Holiday Work restriction will be in place but no impact to travel lanes including Bus Stop & Bike path.
Start Date Submittal Complete Date Status  
11/13/2026 RIGHT-OF-WAY REVIEW v.1 N/A REQUIRES RESUBMIT Review Details