Permit: TR-ROW-1126-01217
Permit Details
Apply Date:
11/02/2026
Applicant:
Luke Muthart
Description:
We will close the left lane of W Pennington St about 400'ft east of N Church Ave. For the placement of dumpster. ROW impact 500'ft. No pavement or asphalt cuts. This is a continuation of Permit TR-ROW-0726-00829. RCB*-*
Permit Reviews
Permit Number - TR-ROW-1126-01217
Permit Status: Issued
Permit Description: We will close the left lane of W Pennington St about 400'ft east of N Church Ave. For the placement of dumpster. ROW impact 500'ft. No pavement or asphalt cuts.
This is a continuation of Permit TR-ROW-0726-00829.
RCB*-*
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/03/2026 | RIGHT-OF-WAY REVIEW v.1 | 11/18/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-1126-01217
Permit Status: Issued
Permit Description: We will close the left lane of W Pennington St about 400'ft east of N Church Ave. For the placement of dumpster. ROW impact 500'ft. No pavement or asphalt cuts.
This is a continuation of Permit TR-ROW-0726-00829.
RCB*-*
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 11/09/2026 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to the Historic Preservation Office, City of Tucson, PO BOX 27210, Tucson AZ 85726...***Please contact Historic Preservation Office at PDSDHistoric@tucsonaz.gov. |
| 11/09/2026 | 24 Hours with barricades at PODS REQUIRED AT ALL TIMES For Roll off (Big Trash Can in the Right of Way) 1) Roll-offs or dumpsters shall be located in areas that are not within a drainageway, storm runoff flow line, or obstructing storm drain infrastructure. 2) Roll-offs or dumpsters shall keep lids on so that roll-off or dumpster is kept covered when not in use. Plugs shall be kept in place. 3) Roll-offs or dumpsters that have openings at sides shall have sealed side door flaps that are kept closed so that waste liquids do not leave container. 4) Damaged containers shall be reported for replacement. |
| 11/09/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 11/09/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 11/09/2026 | Pennington ST is subject to a pavement moratorium. Any disturbance of existing asphalt will require pavement restoration in accordance with the current City of Tucson Public Utility Administrative Manual. A 2-inch mill and overlay covering one-half the width of the roadway shall be required. The final pavement restoration limits shall be confirmed by the ROW inspector at the preconstruction meeting. |
| 11/09/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |