Permit: TR-ROW-1126-01215
Permit Details
Status:
In Review
Type:
Right-of-Way (ROW)
Address:
4101 S WINGATE BL
Address NEW:
4101 S WINGATE BL
Apply Date:
11/02/2026
Applicant:
Chad Hancock
Description:
We will need to set up a Mid-Block on S Wingate Blvd. We will be blocking the northbound lane and shifting all traffic to the east. We are abandoning WR-321A and installing WR-321B. Work area is about 75'ft south of 4101 Wingate Blvd. ROW impact about 500'ft. No asphalt of concrete cuts to be made. The is a continuation of permit TR-ROW-0626-00691. RCB*-*
Permit Reviews
Permit Number - TR-ROW-1126-01215
Permit Status: In review
Permit Description: We will need to set up a Mid-Block on S Wingate Blvd. We will be blocking the northbound lane and shifting all traffic to the east. We are abandoning WR-321A and installing WR-321B. Work area is about 75'ft south of 4101 Wingate Blvd. ROW impact about 500'ft. No asphalt of concrete cuts to be made.
The is a continuation of permit TR-ROW-0626-00691.
RCB*-*
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/02/2026 | RIGHT-OF-WAY REVIEW v.1 | N/A | IN REVIEW |
Outstanding Activity Conditions
Permit Number - TR-ROW-1126-01215
Permit Status: In review
Permit Description: We will need to set up a Mid-Block on S Wingate Blvd. We will be blocking the northbound lane and shifting all traffic to the east. We are abandoning WR-321A and installing WR-321B. Work area is about 75'ft south of 4101 Wingate Blvd. ROW impact about 500'ft. No asphalt of concrete cuts to be made.
The is a continuation of permit TR-ROW-0626-00691.
RCB*-*
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 11/04/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 11/04/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. |
| 11/04/2026 | PROOF OF NOTIFICATION IS REQUIRED. AT THE TIME OF THE PRECONSTRUCTION MEETING |