Permit Details

Status:
Issued
Type:
Right-of-Way (ROW)
Address NEW:
223 N CAMPBELL AV
Apply Date:
11/26/2025
Applicant:
James Redding
Description:
Installation of fiber optic cable on existing TEP poles for network connection to City Of Tucson Water (Hydrology site).

Permit Reviews

Permit Number - TR-ROW-1125-01449
Permit Status: Issued
Permit Description: Installation of fiber optic cable on existing TEP poles for network connection to City Of Tucson Water (Hydrology site).
Start Date Submittal Complete Date Status  
12/11/2025 RIGHT-OF-WAY REVIEW v.2 12/12/2025 APPROVED Review Details
11/26/2025 RIGHT-OF-WAY REVIEW v.1 12/01/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-1125-01449
Permit Status: Issued
Permit Description: Installation of fiber optic cable on existing TEP poles for network connection to City Of Tucson Water (Hydrology site).
Total Outstanding Activity Conditions - 7
Date Name
12/01/2025 BUS STOP IN AREA, CONTACT SUN TRAN DISPTCH AT 520.206.8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
12/01/2025 Traffic control set-up approved between 9AM - 3:30PM
12/01/2025 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
12/01/2025 A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from November 24 to January 02. Due to the increasing traffic volume on many of the City’s roads, it is necessary to restrict lane closures on certain roads during the holiday season.
12/12/2025 Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign.
12/12/2025 Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
12/12/2025 Pre-Activity Meeting w/Inspections Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
PROPOSED SOW_V1.PDF DOCUMENTS VIEW
TCP 25-0152 REV_V2.PDF DOCUMENTS VIEW