Permit: TR-ROW-1125-01393
Permit Details
Apply Date:
11/10/2025
Applicant:
Chris McNary
Description:
Temporary Lane Closures for Subsurface Utility Detection and Survey. No excavation, construction, or installation of new facilities 01/28/2026- New updated Traffic Control Plan in attachments.
Permit Reviews
Permit Number - TR-ROW-1125-01393
Permit Status: Issued
Permit Description: Temporary Lane Closures for Subsurface Utility Detection and Survey. No excavation, construction, or installation of new facilities
01/28/2026- New updated Traffic Control Plan in attachments.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/01/2025 | RIGHT-OF-WAY REVIEW v.2 | 12/03/2025 | REQUIRES RESUBMIT |
| 01/21/2026 | RIGHT-OF-WAY REVIEW REVISION v.1 | 01/27/2026 | APPROVED |
| 01/16/2026 | RIGHT-OF-WAY REVIEW v.6 | 01/20/2026 | APPROVED |
| 01/16/2026 | RIGHT-OF-WAY REVIEW v.5 | 01/16/2026 | REQUIRES RESUBMIT |
| 11/10/2025 | RIGHT-OF-WAY REVIEW v.1 | 11/14/2025 | REQUIRES RESUBMIT |
| 01/14/2026 | RIGHT-OF-WAY REVIEW v.4 | 01/14/2026 | REQUIRES RESUBMIT |
| 01/13/2026 | RIGHT-OF-WAY REVIEW v.3 | 01/14/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-1125-01393
Permit Status: Issued
Permit Description: Temporary Lane Closures for Subsurface Utility Detection and Survey. No excavation, construction, or installation of new facilities
01/28/2026- New updated Traffic Control Plan in attachments.
Total Outstanding Activity Conditions - 8
| Date | Name |
|---|---|
| 01/16/2026 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign. |
| 01/16/2026 | City of Tucson Right of Way Only ROW Permit is only allowed for work within City of Tucson Right of Way. |
| 01/16/2026 | The following extended traffic control set-up times were approved: NIGHT WORK Required for Work along Broadway Blvd, and Impact to Broadway/Euclid Intersection. |
| 01/16/2026 | Message Board to be placed 5 days in advance of Start of Work. And to Remain in place during active work. |
| 01/16/2026 | Pre-Activity Meeting w/Inspections Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 11/12/2025 | BUS STOP IN AREA, CONTACT SUN TRAN DISPTCH AT 520.206.8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 11/12/2025 | UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
| 11/12/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Issued
Permit Number: TR-ROW-1125-01393
Permit Description: Temporary Lane Closures for Subsurface Utility Detection and Survey. No excavation, construction, or installation of new facilities
01/28/2026- New updated Traffic Control Plan in attachments.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/22/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 02/02/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed |