Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-ROW-1125-01374
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW)
Address:
3225 N CAMPBELL AV
Address NEW:
3225 N CAMPBELL AV
Apply Date:
11/04/2025
Applicant:
ANGEL MORALES
Description:
Lane closure for cell tower work.***
Permit Reviews
Permit Number - TR-ROW-1125-01374
Permit Status: Inspections
Permit Description: Lane closure for cell tower work.***
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/04/2025 | RIGHT-OF-WAY REVIEW v.1 | 11/05/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-1125-01374
Permit Status: Inspections
Permit Description: Lane closure for cell tower work.***
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 11/05/2025 | BUS STOP IN AREA, CONTACT SUN TRAN DISPTCH AT 520.206.8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 11/05/2025 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions |
| 11/05/2025 | A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be effect from NOV 25TH to January 3rd. Due to increase traffic volume on many of the city roads, its necessary to restrict lane closures on certain roads during the Gem Show. |
| 11/05/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 11/05/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 11/05/2025 | SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALKS PANELS PER PAG STANDARD DETAIL 200/206 |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-ROW-1125-01374
Permit Description: Lane closure for cell tower work.***
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/18/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 11/20/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed |