Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
417 E 9TH ST
Address NEW:
417 E 9TH ST
Apply Date:
11/03/2025
Applicant:
ANGEL MORALES
Description:
Cipp Lining

Permit Reviews

Permit Number - TR-ROW-1125-01361
Permit Status: Complete
Permit Description: Cipp Lining
Start Date Submittal Complete Date Status  
11/04/2025 RIGHT-OF-WAY REVIEW v.1 11/12/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-1125-01361
Permit Status: Complete
Permit Description: Cipp Lining
Total Outstanding Activity Conditions - 7
Date Name
11/05/2025 Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions
11/05/2025 Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
11/05/2025 PRE-CON/PAVEMENT/ SIDEWALK
11/05/2025 Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property
11/05/2025 Traffic Control set-up approved between 7AM - 5PM
11/05/2025 Traffic control set-up approved between 9AM - 3:30PM
11/05/2025 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-1125-01361
Permit Description: Cipp Lining
Total Completed Inspections - 3
Date Description Inspector Results Comments
11/18/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
12/10/2025 TRSP - ROW - Barricade - Setup/Routine Passed
12/10/2025 TRSP - ROW - Final Passed