Permit: TR-ROW-1124-01367
Permit Details
Apply Date:
11/26/2024
Applicant:
Caitlin Ripley - Southwest Barricades
Description:
Sewer tie 16' x 4'
Permit Reviews
Permit Number - TR-ROW-1124-01367
Permit Status: Complete
Permit Description: Sewer tie 16' x 4'
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/27/2024 | RIGHT-OF-WAY REVIEW v.1 | 11/29/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-1124-01367
Permit Status: Complete
Permit Description: Sewer tie 16' x 4'
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 11/27/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 11/27/2024 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-ROW-1124-01367
Permite Description: Sewer tie 16' x 4'
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/09/2025 | TRSP - ROW - Final | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-1124-01367
Permit Description: Sewer tie 16' x 4'
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/23/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 01/09/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 01/09/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed |