Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-ROW-1124-01305
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
2545 N COLUMBUS BL
Address NEW:
2545 N COLUMBUS BL
Apply Date:
11/06/2024
Applicant:
Andres Amado
Description:
access to existing 54in waterline through access manholes in order to repair 1000lf utilizing carbon fiber renewal.
Permit Reviews
Permit Number - TR-ROW-1124-01305
Permit Status: Complete
Permit Description: access to existing 54in waterline through access manholes in order to repair 1000lf utilizing carbon fiber renewal.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/07/2024 | RIGHT-OF-WAY REVIEW v.1 | 11/12/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-1124-01305
Permit Status: Complete
Permit Description: access to existing 54in waterline through access manholes in order to repair 1000lf utilizing carbon fiber renewal.
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 12/04/2024 | The following extended traffic control set-up times were approved: 24 Hours |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-ROW-1124-01305
Permite Description: access to existing 54in waterline through access manholes in order to repair 1000lf utilizing carbon fiber renewal.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/27/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-1124-01305
Permit Description: access to existing 54in waterline through access manholes in order to repair 1000lf utilizing carbon fiber renewal.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/26/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 02/26/2025 | TRSP - ROW - Barricade Takedown | Passed | ||
| 02/26/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 02/26/2025 | TRSP - ROW - Final | Passed |