Permit: TR-ROW-1124-01295
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
2601 E COCONINO VISTA
Address NEW:
2601 E COCONINO VISTA
Apply Date:
11/05/2024
Applicant:
Kendall Murie
Description:
Las Vistas - S Forgeus Ave Funded by City of Tucson Water mini grants program. Collaboration with neighborhood community body and the mayor's office to install 28 back of curb rainwater basins. In Total: ~550 linear feet of Basin length.
Permit Reviews
Permit Number - TR-ROW-1124-01295
Permit Status: Complete
Permit Description: Las Vistas - S Forgeus Ave
Funded by City of Tucson Water mini grants program.
Collaboration with neighborhood community body and the mayor's office to install 28 back of curb rainwater basins.
In Total: ~550 linear feet of Basin length.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/05/2024 | RIGHT-OF-WAY REVIEW v.1 | 11/13/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-1124-01295
Permit Status: Complete
Permit Description: Las Vistas - S Forgeus Ave
Funded by City of Tucson Water mini grants program.
Collaboration with neighborhood community body and the mayor's office to install 28 back of curb rainwater basins.
In Total: ~550 linear feet of Basin length.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 11/05/2024 | Traffic Control set-up approved between 7AM - 5PM |
| 11/05/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-1124-01295
Permit Description: Las Vistas - S Forgeus Ave
Funded by City of Tucson Water mini grants program.
Collaboration with neighborhood community body and the mayor's office to install 28 back of curb rainwater basins.
In Total: ~550 linear feet of Basin length.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/17/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 01/21/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 02/19/2025 | TRSP - ROW - Barricade Takedown | Passed | ||
| 02/19/2025 | TRSP - ROW - Final | Passed |