Permit: TR-ROW-1123-01353
Permit Details
Apply Date:
11/14/2023
Applicant:
Dan Padilla
Description:
Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
Permit Reviews
Permit Number - TR-ROW-1123-01353
Permit Status: Complete
Permit Description: Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
11/15/2023 | RIGHT-OF-WAY REVIEW v.1 | 11/15/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-1123-01353
Permit Status: Complete
Permit Description: Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
11/15/2023 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
11/15/2023 | Traffic control set-up approved between 9AM - 3:30PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-ROW-1123-01353
Permite Description: Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/14/2023 | TRSP - ROW - Final/Close-Out | N/A | Partial Pass |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-1123-01353
Permit Description: Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/12/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | pre activity inspection was done on the phone | |
12/15/2023 | TRSP - ROW - Final/Close-Out | Passed |