Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Apply Date:
11/18/2022
Applicant:
Alex Stack
Description:
Measure water level at a groundwater monitoring well (45 minutes). Work zone is in the Kino Parkway N/B exit ramp.

Permit Reviews

Permit Number - TR-ROW-1122-00076
Permit Status: Complete
Permit Description: Measure water level at a groundwater monitoring well (45 minutes). Work zone is in the Kino Parkway N/B exit ramp.
Start Date Submittal Complete Date Status  
12/14/2022 RIGHT-OF-WAY REVIEW v.1 12/15/2022 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-1122-00076
Permit Status: Complete
Permit Description: Measure water level at a groundwater monitoring well (45 minutes). Work zone is in the Kino Parkway N/B exit ramp.
Total Outstanding Activity Conditions - 1
Date Name
12/15/2022 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL.

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-1122-00076
Permit Description: Measure water level at a groundwater monitoring well (45 minutes). Work zone is in the Kino Parkway N/B exit ramp.
Total Completed Inspections - 2
Date Description Inspector Results Comments
03/02/2023 TRSP - ROW - Final/Close-Out Passed Work was completed on February 28 no further issues.
02/21/2023 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed I spoke with Alex Stack. Work will be begin on February 28 and also end on that day. Work will only last 45 minutes. Traffic control will be set up and taken down when work is complete.

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
MW-22-11_ROW_PERMIT_SITEPLANS_V1.PDF DOCUMENTS VIEW