Permit: TR-ROW-1122-00076
Permit Details
Apply Date:
11/18/2022
Applicant:
Brittany Bechtold
Description:
Measure water level at a groundwater monitoring well (45 minutes). Work zone is in the Kino Parkway N/B exit ramp.
Permit Reviews
Permit Number - TR-ROW-1122-00076
Permit Status: Complete
Permit Description: Measure water level at a groundwater monitoring well (45
minutes). Work zone is in the Kino Parkway N/B exit ramp.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
12/14/2022 | RIGHT-OF-WAY REVIEW v.1 | 12/15/2022 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-1122-00076
Permit Status: Complete
Permit Description: Measure water level at a groundwater monitoring well (45
minutes). Work zone is in the Kino Parkway N/B exit ramp.
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
12/15/2022 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-1122-00076
Permit Description: Measure water level at a groundwater monitoring well (45
minutes). Work zone is in the Kino Parkway N/B exit ramp.
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/02/2023 | TRSP - ROW - Final/Close-Out | Passed | Work was completed on February 28 no further issues. | |
02/21/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | I spoke with Alex Stack. Work will be begin on February 28 and also end on that day. Work will only last 45 minutes. Traffic control will be set up and taken down when work is complete. |