Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-ROW-1122-00052
Permit Details
Apply Date:
11/07/2022
Applicant:
Jason Smith
Description:
We will be performing the earthwork and installing underground utilities under Dev Plan DP22-0100 & DP22-0149 on parcels 140-41-1250, 140-41-124E, & 140-41-124C. Parcels 140-41-1250 & 140-41-124E are separated from 140-41-124C by Rodeo Wash, so we will need to cross over the wash with three 4-in HDPE lines in order to get construction water from hydrant meters to a temporary basin located on the parcel 140-41-124E north of the wash. We will also need to cross through the right-of-way on the east end of the site for access between parcels There will be no excavation or traffic impact involved in this right of way permit.
Permit Reviews
Permit Number - TR-ROW-1122-00052
Permit Status: Needs resubmittal
Permit Description: We will be performing the earthwork and installing underground utilities under Dev Plan DP22-0100 & DP22-0149 on parcels 140-41-1250, 140-41-124E, & 140-41-124C. Parcels 140-41-1250 & 140-41-124E are separated from 140-41-124C by Rodeo Wash, so we will need to cross over the wash with three 4-in HDPE lines in order to get construction water from hydrant meters to a temporary basin located on the parcel 140-41-124E north of the wash. We will also need to cross through the right-of-way on the east end of the site for access between parcels There will be no excavation or traffic impact involved in this right of way permit.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
12/05/2022 | RIGHT-OF-WAY REVIEW v.1 | 01/06/2023 | REQUIRES RESUBMIT |