Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
In Review
Type:
Right-of-Way (ROW)
Address:
401 E 22ND ST
Address NEW:
401 E 22ND ST
Apply Date:
10/30/2026
Applicant:
Robert Brown
Description:
We will need to hard close S 3rd Ave. From 22nd St 200ft' north. Also closing the south parking lot exit. On eastbound 22nd St we will close the left turn lane. On westbound 22nd we will add no right turn signs. Crew will be removing and replacing ±110 SF of concrete and ±130 SF of asphalt. Work will take 3 days. RCB*-*

Permit Reviews

Permit Number - TR-ROW-1026-01212
Permit Status: In review
Permit Description: We will need to hard close S 3rd Ave. From 22nd St 200ft' north. Also closing the south parking lot exit. On eastbound 22nd St we will close the left turn lane. On westbound 22nd we will add no right turn signs. Crew will be removing and replacing ±110 SF of concrete and ±130 SF of asphalt. Work will take 3 days. RCB*-*
Start Date Submittal Complete Date Status  
11/02/2026 RIGHT-OF-WAY REVIEW v.1 N/A IN REVIEW Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-1026-01212
Permit Status: In review
Permit Description: We will need to hard close S 3rd Ave. From 22nd St 200ft' north. Also closing the south parking lot exit. On eastbound 22nd St we will close the left turn lane. On westbound 22nd we will add no right turn signs. Crew will be removing and replacing ±110 SF of concrete and ±130 SF of asphalt. Work will take 3 days. RCB*-*
Total Outstanding Activity Conditions - 6
Date Name
11/02/2026 This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions.
11/02/2026 Traffic control set-up approved between 9AM - 3:30PM
11/02/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
11/02/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control.
11/02/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
11/02/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.