Permit: TR-ROW-1026-01207
Permit Details
Apply Date:
10/29/2026
Applicant:
Andrew Ruiz
Description:
We will need to set up a soft closure local traffic only at the entrance of the cul-de-sac east of 7219 E Flamenco Dr. We will close the sidewalk in front of 7219 E Flamingo Dr. For an emergency sewer repair. We will excavate a 4x8 trench in the sidewalk and replacing when finished. RCB*-*
Permit Reviews
Permit Number - TR-ROW-1026-01207
Permit Status: Issued
Permit Description: We will need to set up a soft closure local traffic only at the entrance of the cul-de-sac east of 7219 E Flamenco Dr. We will close the sidewalk in front of 7219 E Flamingo Dr. For an emergency sewer repair. We will excavate a 4x8 trench in the sidewalk and replacing when finished.
RCB*-*
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/29/2026 | RIGHT-OF-WAY REVIEW v.1 | 11/16/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-1026-01207
Permit Status: Issued
Permit Description: We will need to set up a soft closure local traffic only at the entrance of the cul-de-sac east of 7219 E Flamenco Dr. We will close the sidewalk in front of 7219 E Flamingo Dr. For an emergency sewer repair. We will excavate a 4x8 trench in the sidewalk and replacing when finished.
RCB*-*
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 11/03/2026 | EMERGENCY AFTER THE FACT PERMIT – A TCP was not provided due to the nature of the work. Any legal questions related to this work shall be directed to Contractor to address because DTM did not have an opportunity to review, approve, or inspect the work. |
| 11/03/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 11/03/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. |
| 11/03/2026 | PROOF OF NOTIFICATION IS REQUIRED . AT THE TIME OF THE PRECONSTRUCTION MEETING |