Permit Details

Status:
Issued
Type:
Right-of-Way (ROW)
Address NEW:
7219 E FLAMENCO DR
Apply Date:
10/29/2026
Applicant:
Andrew Ruiz
Description:
We will need to set up a soft closure local traffic only at the entrance of the cul-de-sac east of 7219 E Flamenco Dr. We will close the sidewalk in front of 7219 E Flamingo Dr. For an emergency sewer repair. We will excavate a 4x8 trench in the sidewalk and replacing when finished. RCB*-*

Permit Reviews

Permit Number - TR-ROW-1026-01207
Permit Status: Issued
Permit Description: We will need to set up a soft closure local traffic only at the entrance of the cul-de-sac east of 7219 E Flamenco Dr. We will close the sidewalk in front of 7219 E Flamingo Dr. For an emergency sewer repair. We will excavate a 4x8 trench in the sidewalk and replacing when finished. RCB*-*
Start Date Submittal Complete Date Status  
10/29/2026 RIGHT-OF-WAY REVIEW v.1 11/16/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-1026-01207
Permit Status: Issued
Permit Description: We will need to set up a soft closure local traffic only at the entrance of the cul-de-sac east of 7219 E Flamenco Dr. We will close the sidewalk in front of 7219 E Flamingo Dr. For an emergency sewer repair. We will excavate a 4x8 trench in the sidewalk and replacing when finished. RCB*-*
Total Outstanding Activity Conditions - 4
Date Name
11/03/2026 EMERGENCY AFTER THE FACT PERMIT – A TCP was not provided due to the nature of the work. Any legal questions related to this work shall be directed to Contractor to address because DTM did not have an opportunity to review, approve, or inspect the work.
11/03/2026 Traffic Control set-up approved between 7AM - 5PM
11/03/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control.
11/03/2026 PROOF OF NOTIFICATION IS REQUIRED . AT THE TIME OF THE PRECONSTRUCTION MEETING

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
ACHEN GARDNER - 7219 E FLAMENCO DR - 526011 - SIDEWALK SOFT CL - PLAN 1_V1.PDF DOCUMENTS VIEW
ACHEN GARDNER - 7219 E FLAMENCO DR - 526011 - SITE PLAN_V1.PDF DOCUMENTS VIEW