Permit: TR-ROW-1026-01192
Permit Details
Apply Date:
10/26/2026
Applicant:
Description:
NOV Spoke with Corbett Farrington.
Permit Reviews
Permit Number - TR-ROW-1026-01192
Permit Status: Issued
Permit Description: NOV
Spoke with Corbett Farrington.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/26/2026 | RIGHT-OF-WAY REVIEW v.1 | N/A | REQUIRES RESUBMIT |
| 11/05/2026 | RIGHT-OF-WAY REVIEW v.3 | 11/13/2026 | APPROVED |
| 10/30/2026 | RIGHT-OF-WAY REVIEW v.2 | N/A | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-1026-01192
Permit Status: Issued
Permit Description: NOV
Spoke with Corbett Farrington.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 11/05/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 11/05/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 11/05/2026 | 5TH ST is subject to a pavement moratorium. Any disturbance of existing asphalt will require pavement restoration in accordance with the current City of Tucson Public Utility Administrative Manual. A 2-inch mill and overlay covering one-half the width of the roadway shall be required. The final pavement restoration limits shall be confirmed by the ROW inspector at the preconstruction meeting. |
| 11/05/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 11/05/2026 | PER MUTCD PROPER ADVANCED WARNING SIGNS AHEAD ARE REQUIRED. PEDESTRAIN ACCESS MUST BE PROVIDED AND MAINTAINED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |