Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Right-of-Way (ROW)
Apply Date:
10/26/2026
Applicant:
ALICIA OROZCO
Description:
1-40YRD WILL BE DELIVERED ON 11/06 AND REMOVE ON 11/09 WILL BE PLACED ON THE W SIDE OF STREET

Permit Reviews

Permit Number - TR-ROW-1026-01183
Permit Status: Inspections complete
Permit Description: 1-40YRD WILL BE DELIVERED ON 11/06 AND REMOVE ON 11/09 WILL BE PLACED ON THE W SIDE OF STREET
Start Date Submittal Complete Date Status  
10/26/2026 RIGHT-OF-WAY REVIEW v.1 10/27/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-1026-01183
Permit Status: Inspections complete
Permit Description: 1-40YRD WILL BE DELIVERED ON 11/06 AND REMOVE ON 11/09 WILL BE PLACED ON THE W SIDE OF STREET
Total Outstanding Activity Conditions - 2
Date Name
10/27/2026 When a refuse collector or mobile storage unit is placed on City of Tucson rights-of-way a City of Tucson Traffic Control Permit is required. City of Tucson right-of-way typically consists of the roadway, sidewalk easement (paved or unpaved) and alley (where access to alleyway is restricted). Refuse collectors and mobile storage units are considered hazards when placed in the City right-of-way and require a Type II barricade with a Type ‘A’ flasher at each end of unit. (Any local barricade company can assist with traffic control needs.) Units placed on City of Tucson right-of-way without a permit and traffic control could be subject to fines or impoundment. 1) Roll-offs or dumpsters shall be located in areas that are not within a drainageway, storm runoff flow line, or obstructing stormdrain infrastructure. 2) Roll-offs or dumpsters shall keep lids on so that roll-off or dumpster is kept covered when not in use. Plugs shall be kept in place. 3) Roll-offs or dumpsters that have openings at sides shall have sealed side door flaps that are kept closed so that waste liquids do not leave container.
10/27/2026 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TR-ROW-1026-01183
Permit Description: 1-40YRD WILL BE DELIVERED ON 11/06 AND REMOVE ON 11/09 WILL BE PLACED ON THE W SIDE OF STREET
Total Completed Inspections - 4
Date Description Inspector Results Comments
11/12/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed no roll off on site removed no precon
11/12/2026 Required: Start Work Notice - Notify your DTM Inspector of your work start date. Notification only; you will be contacted if a Pre-Activity Meeting is needed. Passed no roll off on site removed
11/12/2026 TRSP - ROW - Notice of Completion Passed no roll off on site removed
11/12/2026 Passed no roll off on site removed

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW