Permit Details

Status:
In Review
Type:
Right-of-Way (ROW)
Address:
115 S LINDA AV
Address NEW:
115 S LINDA AV
Apply Date:
10/21/2026
Applicant:
Andrik Valdez
Description:
This ROW permit is being pulled so the sidewalk North of the Project can be closed for sidewalk demolition and replacement in the same mobilization.

Permit Reviews

Permit Number - TR-ROW-1026-01172
Permit Status: In review
Permit Description: This ROW permit is being pulled so the sidewalk North of the Project can be closed for sidewalk demolition and replacement in the same mobilization.
Start Date Submittal Complete Date Status  
10/26/2026 RIGHT-OF-WAY REVIEW v.1 N/A IN REVIEW Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-1026-01172
Permit Status: In review
Permit Description: This ROW permit is being pulled so the sidewalk North of the Project can be closed for sidewalk demolition and replacement in the same mobilization.
Total Outstanding Activity Conditions - 8
Date Name
10/26/2026 This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to the Historic Preservation Office, City of Tucson, PO BOX 27210, Tucson AZ 85726...***Please contact Historic Preservation Office at PDSDHistoric@tucsonaz.gov.
10/26/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
10/26/2026 Traffic control set-up approved between 9AM - 3:30PM
10/26/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
10/26/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
10/26/2026 PER MUTCD PROPER ADVANCED WARNING SIGNS AHEAD ARE REQUIRED. PEDESTRAIN ACCESS MUST BE PROVIDED AND MAINTAINED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALKS PANELS PER PAG STANDARD DETAIL 200/206
10/26/2026 If work begins before November 8, the work area must be cleaned and cleared of all debris prior to the All Souls event.
10/26/2026 A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be effect from NOV 23rd to January 3rd. Due to increase traffic volume on many of the city roads, its necessary to restrict lane closures on certain roads during the Gem Show.