Permit Details

Status:
Needs Resubmittal
Type:
Right-of-Way (ROW)
Address NEW:
2504 E ELM ST UNIT 100
Apply Date:
10/21/2026
Applicant:
Briana Castro
Description:
Hand dig and place 2 - 2" HDPE from existing HH to new pole location. Remove and restore concrete sidewalk panels.

Permit Reviews

Permit Number - TR-ROW-1026-01168
Permit Status: Needs resubmittal
Permit Description: Hand dig and place 2 - 2" HDPE from existing HH to new pole location. Remove and restore concrete sidewalk panels.
Start Date Submittal Complete Date Status  
10/26/2026 RIGHT-OF-WAY REVIEW v.1 11/02/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-1026-01168
Permit Status: Needs resubmittal
Permit Description: Hand dig and place 2 - 2" HDPE from existing HH to new pole location. Remove and restore concrete sidewalk panels.
Total Outstanding Activity Conditions - 5
Date Name
10/27/2026 **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14
10/27/2026 Arterial/Collector Pavement Moratorium [Street name] is subject to a pavement moratorium. Any disturbance of existing asphalt will require a 2-inch mill and overlay extending a minimum of 25 feet in each direction from the outside edge of the cut, across all affected travel lanes. The final pavement restoration limits shall be confirmed by the ROW inspector at the preconstruction meeting.
10/27/2026 Traffic control set-up approved between 9AM - 3:30PM
10/27/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
10/27/2026 A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 02. Due to the increasing traffic volume on many of the City’s roads, it is necessary to restrict lane closures on certain roads during the holiday season.