Permit: TR-ROW-1026-01145
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW)
Address:
7901 E GOLF LINKS RD
Address NEW:
7901 E GOLF LINKS RD
Apply Date:
10/15/2026
Applicant:
dan wilson
Description:
Project: T-Mobile WCF on an existing TEP utility pole Building Permit: TC-UTL-0823-00082 Closure: One southmost eastbound lane right turn lane still open onto Pantano Schedule: Sundays ONLY, October 25 through December 6, 2026 Hours: Sunrise to sunset Dates: October 25; November 1, 8, 15, 22, 29; and December 6
Permit Reviews
Permit Number - TR-ROW-1026-01145
Permit Status: Inspections
Permit Description: Project: T-Mobile WCF on an existing TEP utility pole
Building Permit: TC-UTL-0823-00082
Closure: One southmost eastbound lane
right turn lane still open onto Pantano
Schedule: Sundays ONLY, October 25 through December 6, 2026
Hours: Sunrise to sunset
Dates: October 25; November 1, 8, 15, 22, 29; and December 6
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/21/2026 | RIGHT-OF-WAY REVIEW v.1 | 10/28/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-1026-01145
Permit Status: Inspections
Permit Description: Project: T-Mobile WCF on an existing TEP utility pole
Building Permit: TC-UTL-0823-00082
Closure: One southmost eastbound lane
right turn lane still open onto Pantano
Schedule: Sundays ONLY, October 25 through December 6, 2026
Hours: Sunrise to sunset
Dates: October 25; November 1, 8, 15, 22, 29; and December 6
Total Outstanding Activity Conditions - 8
| Date | Name |
|---|---|
| 10/22/2026 | Bus Stop/Route |
| 10/22/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 10/22/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 10/22/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 10/22/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 10/27/2026 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign |
| 10/27/2026 | Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk |
| 10/27/2026 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-ROW-1026-01145
Permit Description: Project: T-Mobile WCF on an existing TEP utility pole
Building Permit: TC-UTL-0823-00082
Closure: One southmost eastbound lane
right turn lane still open onto Pantano
Schedule: Sundays ONLY, October 25 through December 6, 2026
Hours: Sunrise to sunset
Dates: October 25; November 1, 8, 15, 22, 29; and December 6
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/29/2026 | Required: Start Work Notice - Notify your DTM Inspector of your work start date. Notification only; you will be contacted if a Pre-Activity Meeting is needed. | Passed | I spoke with Dan @ Wallen Communications who told me that they would begin working this Sunday and continue to only work Sundays until completion of work. All work is aerial work with no impact to right of way. | |
| 10/29/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | I spoke with Dan @ Wallen Communications who told me that they would begin working this Sunday and continue to only work Sundays until completion of work. All work is aerial work with no impact to right of way. |